Buildings are often stuck due to limited permits which I think the authorities should overlook.
The sanctioning authority must also observe the time limit specified in the rule book! We sincerely hope that one day we will see one window clearance from this stage!
The list of NOCs and procedures for starting construction is long, not to mention the building aspect!
Making paperwork takes longer than building a real slab! Yes, it takes 7 to 15 days to manufacture panels using MIVAN technology, but it takes longer to get basic approval or NOC.
Here's a big shout-out to all the honest, hardworking builders who have been screaming day and night to bring us our homes. Share this with all your builder friends!
But most importantly, follow us for more real estate information, Let's get started!
No. 1:
Intimation of Disapproval (IOD)
It is the first development approval granted by the authority which qualifies the builder to prompt the process of vacating the existing structure and then destroying the same. This approval is granted to the builder only if the laid down conditions are complied with however if the conditions are not complied with then the permission stands disapproved.
No. 2:
Commencement Certificate (CC)
It is the development authorisation granted by the authority which qualifies the builder to initiate construction! This is generally given out in parts. For example, for a 10-floor building, the first CC may be given to the plinth level, then the next CC may be issued to the 5th floor, and then the next for till the 10th floor.
No.3:
Occupancy Certificate (0C)
Final approval documenting the construction phase, certifying that the building is built as per the sanctioned plans and is now fit for occupancy along with habitable utilities such as electricity and water: Possession without the 0C is believed unlawful by municipal authorities!
Apart from these basic approval documents, there are miscellaneous NOCs builder’s ought for approvals, depending on their micro locality and project type.
01. NA permission
02. Tree Authority NOC
03. Sewage Dept NOC
04. Hydraulic Dept NOC
05. Environmental Clearance
06. AAI NOC
07. Ancient Monument Approval
08. Traffic & Coordination Dept NOC
09. CRZ Clearance
10. Permission for Excavation
11. Structural Plan & Layout Approval
12. Storm Water & Drain Dept NOC
13. Fire NOC